Peak shaving and energy management at an industrial site
The system can reduce demand peaks and increase PV self-consumption when the grid connection and EMS are matched to the load profile.
Requirements
Load profile, grid capacity, tariff, EMS, short-circuit study and protection coordination.
Caveats
720 kW is the datasheet rating; it is not confirmed as continuous AC output at site conditions.
Grid support and islanding transition
The datasheet states 80 ms grid-to-island transition. This may matter for selected critical circuits after islanded-operation conditions are confirmed.
Requirements
Grid-code study, switching scheme, critical-load list and grid-operator approvals.
Caveats
80 ms is a datasheet claim. Actual timing and behaviour depend on configuration, protection and grid conditions.
Industrial-scale PV self-consumption
The unit can buffer PV surplus and discharge during peak hours when the DC/AC architecture and interconnection are compatible.
Requirements
1040–1500 V DC range, PV inverter type, DC/AC architecture and interconnection design.
Caveats
The record does not confirm compatibility with a specific PV inverter or charging strategy.