Peak shaving and self-consumption at a commercial site
The unit can shift PV or off-peak energy into peak hours when the site has a suitable load profile and EMS.
Requirements
A 15-minute load profile, tariff, grid connection capacity, inverter/EMS interoperability and an electrical design.
Caveats
Continuous power, efficiency and usable energy are not stated, so savings cannot be calculated reliably yet.
Support for critical-load circuits
It can support selected critical circuits when load separation and a transfer scheme have been engineered.
Requirements
A critical-load list, acceptable transfer time, switching scheme and protection coordination.
Caveats
This is not a UPS. Transfer time, surge capability and overload behaviour are not confirmed in the current record.
Adding storage to an existing PV installation
The unit can increase PV self-consumption, but the DC/AC interface and interconnection conditions must be checked.
Requirements
PV inverter type and voltage range, DC/AC architecture, grid-operator approval and an installation design.
Caveats
The record does not confirm direct compatibility with an existing PV inverter.